OPERATION OF EVRIPOS BRIDGE FROM JULY TO SEPTEMBER 2024
OLNE SA announces that from Monday July 1st until 30th September 2024, the bridge of the Port of Evripos will open every day except Wednesdays and Saturdays, to serve the needs of navigation.
OLNE SA announces that from Monday July 1st until 30th September 2024, the bridge of the Port of Evripos will open every day except Wednesdays and Saturdays, to serve the needs of navigation.
OLNE SA announces that on Tuesday 11/6 and Thursday 13/6/ 2024, the drawbridge of the bridge of the Port of Evripos will not operate to serve the needs of navigation, due to high temperature.
OLNE SA announces that from Monday, June 3rd and during the summer period, the bridge of the Port of Evripos will open every day except Saturdays, due to the start of the summer season and increased navigation needs.